BRIDGE OVER THE MARANHÃO DAM

BRIDGE OVER THE MARANHÃO DAM
Aviz, Portugal

Project Description

Suspended Bridge with a central span of 80m and with a total length of 140m. Repair and Reinforcement of the deactivated structure after a fire incident. Original Project by Prof. Edgar Cardoso (1957).

Implemented services

Concept, Preliminary and Detailed Designs of structures and foundations, including Technical Assistance during the construction, Load tests and Monitoring.

 

Year
1999

Client Name
Câmara Municipal de Aviz