Projectos
BRIDGE OVER THE SAVE RIVER

BRIDGE OVER THE SAVE RIVER
Save River, Mozambique

Project Description

Suspension bridge over Save river, with 3 central spans with 210m and 2 lateral spans
with 90m. Original solution where the classical rigidity beam of the traditional suspended
bridges, was replaced with two pre-stressed cables over the entire bridge, with inclined
suspenders and funicular cables, a highly stable structure with very low deflections.
Suspension bridge over Save river, with 3 central spans with 210m and 2 lateral spans with 90m. Original solution where the classical rigidity beam of the traditional suspended bridges, was replaced with two pre-stressed cables over the entire bridge, with inclined suspenders and funicular cables, a highly stable structure with very low deflections.

Implemented services

Concept, Preliminary and Detailed Designs of structures, including
Site Technical Assistance during Construction and Load Tests.
Concept, Preliminary and Detailed Designs of structures, including Site Technical Assistance during Construction and Load Tests.

Year
1962

Client Name
Governo de Moçambique