NACALA PORT

NACALA PORT
Nacala, Mozambique

Project Description

 

In the second stage of development of the Nacala Port, it was planned the construction of a pier, on the South of the Maiaia bridge, and the extension to Southwest of the existing wall-pier, on the bridge´s north side.
The main pier is composed by a platform with 160 m length and 22m wide, and it´s main resistant element is a 0,60m reinforced concrete slab, supported on 186 piles.
 
In the second stage of development of the Nacala Port, it was planned the construction of a pier, on the South of the Maiaia bridge, and the extension to Southwest of the existing wall-pier, on the bridge´s north side.
The main pier is composed by a platform with 160 m length and 22m wide, and it´s main resistant element is a 0,60m reinforced concrete slab, supported on 186 piles.
 

 

Implemented services

Concept and Detailed Designs of structures, including site Technical Assistance during Construction and Load Tests.

Year
1972

Client Name
Governo de Moçambique